Seacoast Bank

Seacoast Bank

The commercial electrical department of Neo Electric is proud to be a part of the remodel for Seacoast Bank in Jacksonville, FL.

This project consisted of providing temporary power and lighting for demolition work. Demolishing and removing existing circuitry not required for the final installation. Furnishing and installing the following new equipment: 

  • New circuitry as indicated on plans
  • Wiring for power and lighting circuits as indicated on plans 
  • New light fixtures
  • Single gang boxes 
  • New TRIPP LITE Open Frame Rack,2-Post: 25 Rack Units, Floor Mount, 49 in x 20 1/4 in x 4 3/4 in, 2-Post IT rack and 48-port patch panel
  • (2) 2” conduit sleeves
  • Addressable Relay Module to release doors upon fire alarm activation
  • All low voltage stubs and back boxes

Plus, electrical permits and fees and fireproofing of all electrical penetrations. 

Address

1001 Kings Avenue Jacksonville, FL 32207

Date Completed

Ongoing

Features

Wiring controls, lighting, power, all new circuitry, lighting controls, equipment and signage, temporary lighting, generator, ATS, fireproofing

Related Projects

Carmax

Carmax

The commercial electrical department of Neo Electric is proud to be doing an interior renovation for Carmax Store #7260 in Jacksonville, FL.

This project consisted of providing temporary power and lighting as required for demolition and removing all existing circuitry not required for the final installation. Furnishing and installing the following new equipment: 

  • (1) 480V, 3-phase primary to 208Y/120V, 3-phase secondary, 45kVA transformer (1) 225A, 208/120V, 3-phase, 4-wire, 10kAIC panelboard labeled “LCPB” (1) 225A, 208/120V, 3-phase, 4-wire, 10kAIC panelboard labeled “RA” 
  • New electrical circuitry as indicated on the plans.  
  • All wiring for power and lighting systems per the plans. Plus, owner-furnished light fixtures 
  • Four (4) new exit light fixtures 
  • Ceiling- and wall-mounted occupancy sensors
  • New floor outlets. Remove and replace devices in the business office as required to accommodate new millwork. Relocate existing RTU thermostats 
  • New receptacles
  • Power poles to supply Wiremold systems 
  • All low-voltage rough-in, including conduits, back boxes, and stub-outs. Include all required electrical permits and associated fees.
  • Provide firestopping/fireproofing for all electrical penetrations.

Address

7438 Blanding Blvd Jacksonville, FL 32244 

Date Completed

Ongoing

Features

Wiring controls, lighting, power, all new circuitry, lighting controls, equipment and signage, temporary lighting, generator, ATS, new outlets, fireproofing

Related Projects

Aging True

Aging True

The commercial electrical department of Neo Electric is proud to have completed the electrical system for Aging True in Jacksonville, FL.

This project consisted of providing temporary power and lighting for demolition work. Demolishing and removing existing circuitry not required for the final installation. Furnishing and installing the following new equipment: 

  • CT cabinet 
  • 1200A Main Distribution Panel (MDP) 
  • (3) 400A sub-panels 
  • (3) 225A sub-panels 
  • GC-provided automatic transfer switch (ATS) per the one-line diagram 
  • GC-provided generator per the one-line diagram.
  • Secondary conduits and feeders 
  • JEA-provided primary conduits 
  • New circuitry as indicated on the plans
  • Wiring for power and lighting circuits as indicated on the plans
  • Disconnect switches as required for mechanical equipment
  • New light fixtures, exit signs, and associated controls
  • Cord reel receptacles per Drawing E401, Note 4
  • Low-voltage stubs, conduits, and back boxes
  • Fireproof all electrical penetrations

Address

4250 Lakeside Dr #116, Jacksonville, FL 32210

Date Completed

Ongoing

Features

Wiring controls, lighting, power, all new circuitry, lighting controls, equipment and signage, temporary lighting, generator, ATS

Related Projects

Longhorn Steakhouse

Longhorn Steakhouse

The commercial electrical department of Neo Electric is proud to have completed the electrical system for Longhorn Steakhouse in Zephryhills, FL.

 This project consisted of providing temporary lighting while furnishing and installing full electrical system including utility transformer, panels, meter, and disconnects. Plus, all wiring for power, kitchen equipment and refrigeration, and lighting.

Address

7495 Gail Blvd, Zephyrhills, FL, 33541

Date Completed

12/2024

Features

Wiring controls, fire alarm, lighting, power, all new circuitry, lighting controls, circuits for kitchen equipment and signage, temporary lighting, A/V

Related Projects

Cooper’s Hawk

Coopers Hawk

The commercial electrical department of Neo Electric is proud to have completed the electrical system for Cooper’s Hawk San Jose.

 This project consists of providing temporary lighting while furnishing and installing new electrical service, including switchgear, panels, surge protection devices (SPDs), meter, kitchen equipment and lighting. Plus, power and wiring for mechanical equipment, exhaust fans (EF), heaters, trash compactor,  refrigeration equipment and low voltage & fire alarm

 

Address

10601 San Jose Blvd Unit 300, Jacksonville, FL 32257

Date Completed

11/2024

Features

Wiring controls, fire alarm, lighting, power, all new circuitry, lighting controls, circuits for kitchen equipment and signage, temporary lighting, mechanical equipment

Related Projects

Starbucks

Starbucks

The commercial electrical department of Neo Electric is proud to have completed the electrical system for Starbucks Palm Coast.

 This project consists of furnishing and installing wiring for kitchen equipment, lighting and mechanical equipment. Plus, all other electrical requirments.

Address

216 Palm Coast Parkway NE Palm Coast, FL 32137 

Date Completed

11/2023

Features

Wiring controls, fire alarm, lighting, power, all new circuitry, lighting controls, circuits for kitchen equipment and signage, mechanical equipment 

Related Projects

Dutch Bros Coffee

Dutch bros coffee

The commercial electrical department of Neo Electric is proud to have completed the electrical system for Dutch Bros Coffee Argyle Forest.

 This project consists of providing temporary lighting while installing new Main Distribution Panel (MDP), Current Transformer (CT) Cabinet, panels, meter, and disconnects. Plus, all wiring for power, kitchen equipment, and lighting.

Address

 7720 Argyle Forest Blvd, Jacksonville, FL 32244

Date Completed

12/2023

Features

Wiring controls, fire alarm, lighting, power, all new circuitry, lighting controls, circuits for kitchen equipment and signage, temporary lighting

Related Projects

Warby Parker

warby parker

The commercial electrical department of Neo Electric is proud to work on the electrical system for Warby Parker Jax Beach.

 This project consists of providing temporary lighting while installing and furnishing full electrical system.

Address

3968 3rd Street South Jacksonville Beach, FL 32250

Date Completed

Ongoing

Features

Wiring controls, fire alarm, lighting, power, all new circuitry, lighting controls, circuits for kitchen equipment and signage, temporary lighting

Related Projects

Bluebird Kids Health

Bluebird kids health

The commercial electrical department of Neo Electric is proud to work on the electrical system for Bluebird Kids Health.

 This project consists of installing and furnishing all new panel, circuitry and wiring for power and lighting within an existing infrastructure.

Address

5000-3 Norwood Ave., Lot 3, Jacksonville, FL 32208

Date Completed

Ongoing

Features

Wiring controls, fire alarm, lighting, power, all new circuitry, lighting controls

Related Projects

Porsche New Service Facility

PORSCHE NEW SERVICE FACILITY

The commercial electrical department of Neo Electric is proud to work on the Porsche New Service Facility in St. Augustine, FL.

This project includes installing all electrical services needed inside and outside of the building. Our team will continue to provide electrical work as needed.

Address

500 World Commerce Pkwy, St. Augustine, FL 32092

Date Completed

Ongoing

Features

HVAC equipment, wiring controls, fire alarm, lighting, power, lighting controls, EV chargers

Related Projects